Project Overview

The Connector project is comprised of two new connections between Terminal 2 and Terminal 3, one pre-security and one post-security; 100,000 sq ft of office space for airport executives and various airport departments; leasable tenant space; and additional passenger amenities and lounges. The project will also include make-ready work and the relocation of a number of critical airport facilities. All gates and terminals will remain fully operational during construction, and preserving the passenger experience is a top priority. The Connector project allows passengers, both pre-and post-security, to travel between terminals with ease.

Mechanical Highlights

  • Cooling Production is provided via Connection to the SFIA campus chilled water system

  • High-Efficiency rooftop Air Handling Systems complete with Carbon and PCO filtration to mitigate odors from the jet engine exhaust at the gates

  • Heating Production is provided via connection to the SFIA campus high temp hot water system and local heat exchangers

 

Designed for LEED Gold Certification, Triple Bottom Line goals, and potentially Net Zero Energy 