Project Overview
The 174,000 SF polytrauma and blind rehabilitation center is one of five polytrauma centers nationally and the only one combining polytrauma and blind rehabilitation services under one roof, making it the largest federal facility of its kind. The design evaluates every element against sensory metrics to minimize barriers and integrate advanced accessibility and rehabilitation practices. Housing 24 polytrauma, 32 blind rehabilitation, and 12 transitional beds, the facility features natural light, non-institutional materials, and corridor railings supporting a “mobility without crutches” approach to therapy developed in close collaboration with staff to favor functional, calming design over unnecessary stimulation.
Mechanical Highlights
1,300T chilled water system
Connection to existing campus wide steam system
Underground chilled water and steam distribution piping
Steam to heating water systems
Dust collection systems
Owner
U.S. Department of Veterans Affairs
General Contractor
Walsh Construction
Architect
SmithGroup Companies, Inc.
Mechanical Engineer
Capital Engineering Consultants
Year Complete
2016
Size
174,000 SF – Rehab Facility 210,000 SF – Parking Structure
Contract Type
Plan & Spec
Certifications
N/A
At A Glance
One of only five polytrauma centers nationally, this 174,000-SF facility is the largest federal rehabilitation center of its kind, housing 24 polytrauma, 32 blind rehabilitation, and 12 transitional beds. FMB’s scope spanned demolition, a 600-car parking structure, and the three-story center, delivering a new patient wing, a 1,300-ton central chiller plant, and underground steam and chilled water distribution.