Owner
Sutter North Medical Foundation
Location
Yuba City, CA
Architect
Boulder & Associates
Mechanical Engineer
Frank M. Booth Design Build Co.
Year Complete
2001
Size
40,000 SF
Contract Type
Design Build
Mechanical Contractor
Frank M. Booth Design Build Co.
Project Overview
Two-story, 40,000 SF steel framed facility. Primary facility for urgent care consisting of X-ray, MRI and Ultrasonic medical equipment.
Mechanical Highlights
- FMB was the design engineer and the mechanical contractor.
- Complete plumbing and HVAC.
- HVAC system consisted of VAV dual duct system fed from rooftop equipment.
- Dedicated air-cooled equipment was provided to serve 24-hour zones.
- Design and construction completed in 15 months.