Two three-story structures with an adjoining atrium totaling 140,000 SF with 711 surface parking spaces to serve the healthcare needs of veterans in the region.
Mechanical Highlights
600T total of roof top AC units
9,000 MBH total of skid mounted boilers
800,000 BTU total of skid mounted water heaters
(243) VAV with reheat zones
45,000 CFM total exhaust
(21) split system units
Owner
U.S. Department of Veterans Affairs
General Contractor
Otto Construction
Architect
Nichols Melburg & Rossetto
Mechanical Engineer
Capitol Engineering Consultants
Year Complete
2017
Size
140,000 SF
Contract Type
Design-Build
Certifications
N/A
At A Glance
This 140,000 SF veterans healthcare facility features two three-story structures joined by an atrium with 711 parking spaces. FMB installed four 150-ton rooftop AC units, three 3,000 MBH boilers, 243 VAV with reheat zones, 21 split systems, and three 15,000 CFM exhaust fans.