Project Portfolio


Healthcare-Hospital

Modesto Memorial Hospital North Tower Addition

Owner

Memorial Hospital Association

Location

Modesto, CA

Architect

Chong I Partners Architecture

Mechanical Engineer

Ainsworth Associates

Year Complete

2007

Size

376,000 SF

Contract Type

Design, Bid, Build

Mechanical Contractor

Frank M. Booth, Inc.

Project Overview

This project consists of a seven-story 376,000 sf surgical center with a below grade basement and a fully enclosed mechanical penthouse. The North Tower is supported by a new 33,000 sf Central Utility Plant connected by a 300 ft. utility tunnel. 

Mechanical Highlights

 

  • 2,500-tons of chilled water system offical replica watches along with 50 million BTUH’s of hot water system.
  • Thermal fluid heat steam generation system.
  • Variable air volume air handling system dear replica watches uk in a built-up penthouse at the 8th level.
  • <