Project Portfolio


Special Interest

Cathedral Of The Blessed Sacrament

Owner

Catholic Diocese of Sacramento

Location

Sacramento, CA

Architect

Beyer Blinder Belle Architects and Planners

Mechanical Engineer

Capital Engineering Consultants, Inc.

Year Complete

2005

Size

44,300 SF

Contract Type

Design Assist

Mechanical Contractor

Frank M. Booth, Inc.

Project Overview

Project consists of the complete renovation of a 110 year old multi-story cathedral.  Upgrades include new HVAC and plumbing systems.

 

Mechanical Highlights 

  • Underfloor air distribution to main level (over 425 swirl diffusers).
  • High efficiency evaporative condensing chiller on roof.
  • New rooftop boiler with integral prefabricated skid. UK Exact Replica Watches Online
  • Two 10,000 cfm indoor air handlers and twelve fan coils.
  • Commercial kitchen with grease/fume removal system.
  • Complete DDC system. Luxury Replica Watches Brands for Men
  • Special baptismal plumbing systems.
  • <