Project Portfolio


Educational

UCD Giedt Hall

Owner

University of California, Davis

Location

Davis, CA

Mechanical Engineer

Frank M. Booth, Inc.

Year Complete

2007

Size

15,000 SF

Contract Type

Design Build

Mechanical Contractor

Frank M. Booth, Inc.

Project Overview

Project consists of a single story, 650-seat, 15,000 SF classroom building.  The building provides a state-of-the-art learning environment for students and includes two classrooms and three lecture theaters, including a 278-seat auditorium. 

Mechanical Highlights

 

  • FMB was the design engineer and the mechanical contractor.
  • Project exceeds 2005 Title-24 efficiency by 20%.
  • Chilled water/hot water VAV air handling system.
  • Heating water is provided by steam to hot water heat exchangers.
  • Site chilled water and steam connections to campus mains.
  • CO2 monitoring and outside air control in all rooms.
  • <