Sutter North MOB, Phase A

Owner

Sutter North Medical Foundation

Location

Yuba City, CA

Architect

Boulder & Associates

Mechanical Engineer

Frank M. Booth Design Build Co.

Year Complete

2001

Size

40,000 SF

Contract Type

Design Build

Mechanical Contractor

Frank M. Booth Design Build Co.

Project Overview

Two-story, 40,000 SF steel framed facility. Primary facility for urgent care consisting of X-ray, MRI and Ultrasonic medical equipment. 

Mechanical Highlights

  • FMB was the design engineer and the mechanical contractor.
  • Complete plumbing and HVAC.
  • HVAC system consisted of VAV dual duct system fed from rooftop equipment.
  • Dedicated air-cooled equipment was provided to serve 24-hour zones.
  • Design and construction completed in 15 months.